Children’s ministry - More photos in phase 6!
Hard working locals are being hired
Beautiful doors are being installed
One screw at a time in creating the center
Electrical supplies being used
A door is professionally installed
Light fixtures for interior rooms
Each day brings us closer to the opening!
Little by little each room recieves wiring
Shutters are installed on some windows
India Project
Phase 5: Plumbing, Electric and More!
Estimate - $17,955 USD
Dispursed funds - $17,955 USD
Project Details : Faith Builders Fellowship is
building a church / ministry center to serve the
poor people of India and share the power of Jesus’
love and redemption. We are raising funds to
complete the project and begin using the facility.
Phase Four Details :
The purchase and installation of windows, doors,
tiles, electrical, painting materials and plumbing.
The final work on the roof which includes additional
iron and cement work.
$3000 - $7000 - $10,000 - $13,000 - $17,955
Phase 5 completed in Dec 2025
Carrying one brick at a time!
Full load ready to be brought to the roof
Bags of cement
More bricks delivered to the building site
Ongoing ministry while waiting for the building funds
Electrical transfer from hut to building
Little by little up to the roof
The bricks are on the roof!
Now building the walls
Working together to accomplish this task
Cutting rebar one piece at a time
Before the bricks were placed
Interior coming along nicely
More iron work
Scaffolding tied together with rope
Iron work for some windows
Placing the upper scaffolding
Installing an iron gate
Exterior cement on the left side of building
Timber scaffolding delivery on bike
Finishing up and taking down the scaffolding
Readying the windows for the iron
Steady footwork
Half way down the building
Concrete work above the windows
Each side of the building to be completed
One side finished
Looking good from the rear of the building
Cement plaster protects the brick from the weather
Smoothing out the cement is not an easy skill
The right side of the building begins!
Two more sides to go!
The right side is half way done
Cement plaster mixing for the exterior walls
Exterior plastering is tough work, but good work
Work on the front of the building has begun!
Keeping the building dry from the rain
Working under the lights in the evening
The front of building is coming along
Electric is now directly attached to building
The ouside plaster cement is done!
Interior plaster cementing has begun
No more electric hay shed
More and more bags to mix
Second floor view from front of building
Piping for electrical outlets
Second story security with Iron bars
Looks like a possible sink or basin?
Electrical units in India
Possible shelving?
Drilling for the plumbing install
Making sure all the supplies are ready.
Marking the building for the install
More interior plumbing work
Readying for the outdoor plumbing
Iron gates for security are installed
Installing the exterior pipes
Bath pipes installed
Cutting the pipes to the proper length
More interior plumbing work
Indoor floor plumbing installed
Wall water piping installed
Pipes running to the septic tank
Painting teamwork
Getting ready to paint the building
The exterior painting begins
Painting with a hand brush one stroke at a time
The exterior of the building is painted
Painting the exterior window openings
Here comes the windows
Teamwork and lots of paint
One room at a time
The exterior painting is complete
Painting on the interior begins
Some windows are wood framed
After the bricks were set
Looking good on the roof
View from the ground
View from the side of the building
Cutting pipe channels into the brick
Supply and material inspection
Electrical piping install
Project Re-Evaluation :
All phases are under consistent
evaluation due to high inflation and changing
supply costs, property delays and staff
restructuring. Please continue to pray for the
Indian people that will be helped through this
project.
Latest photos are at the bottom of this page.